Sailing Squibvideo
Squib's Refit - Preparations for Kiwigrip - Mounting deck hardware - Epoxy work /91
2. november 2024 · 15 min · 738 visninger · Vienna
Hva denne videoen dekker
The refit of the boat Squib focuses on deck preparation, hardware installation, and structural repairs in high-temperature conditions. Work includes filling and sanding deck holes, smoothing previous epoxy repairs, and sanding the hull to remove paint runs and drips in preparation for applying KiwiGrip non-skid coating.2:02 The crew also reinforces the electric outboard motor mount by laminating fiberglass mats with epoxy.3:46 Hardware installation involves sealing deck fittings, such as genoa reefing line fairleads, using butyl tape to ensure a watertight seal.13:22 The process requires precise positioning of new hardware after filling old mounting holes.3:06 Interior work includes painting and finishing the galley cabinetry before final installation.8:56 The project involves iterative sanding and filling to achieve a smooth finish on both the exterior hull and interior components.8:07 The crew coordinates tasks to manage the heat and ensure surfaces are properly prepped for final coatings.0:04
Mer fra Sailing Squib
Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



