Sailing Squibvideo

Squib's Refit - Preparations for Kiwigrip - Mounting deck hardware - Epoxy work /91

2 November 2024 · 15 min · 739 views · Vienna

What this video covers

The refit of the boat Squib focuses on deck preparation, hardware installation, and structural repairs in high-temperature conditions. Work includes filling and sanding deck holes, smoothing previous epoxy repairs, and sanding the hull to remove paint runs and drips in preparation for applying KiwiGrip non-skid coating.2:02 The crew also reinforces the electric outboard motor mount by laminating fiberglass mats with epoxy.3:46 Hardware installation involves sealing deck fittings, such as genoa reefing line fairleads, using butyl tape to ensure a watertight seal.13:22 The process requires precise positioning of new hardware after filling old mounting holes.3:06 Interior work includes painting and finishing the galley cabinetry before final installation.8:56 The project involves iterative sanding and filling to achieve a smooth finish on both the exterior hull and interior components.8:07 The crew coordinates tasks to manage the heat and ensure surfaces are properly prepped for final coatings.0:04

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sept 2026Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026

From Sailing Squib — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue