Sailing Squibvideo
Squib's Refit - Preparations for Kiwigrip - Mounting deck hardware - Epoxy work /91
2 de noviembre de 2024 · 15 min · 738 vistas · Vienna
¿Qué cubre este video?
The refit of the boat Squib focuses on deck preparation, hardware installation, and structural repairs in high-temperature conditions. Work includes filling and sanding deck holes, smoothing previous epoxy repairs, and sanding the hull to remove paint runs and drips in preparation for applying KiwiGrip non-skid coating.2:02 The crew also reinforces the electric outboard motor mount by laminating fiberglass mats with epoxy.3:46 Hardware installation involves sealing deck fittings, such as genoa reefing line fairleads, using butyl tape to ensure a watertight seal.13:22 The process requires precise positioning of new hardware after filling old mounting holes.3:06 Interior work includes painting and finishing the galley cabinetry before final installation.8:56 The project involves iterative sanding and filling to achieve a smooth finish on both the exterior hull and interior components.8:07 The crew coordinates tasks to manage the heat and ensure surfaces are properly prepped for final coatings.0:04
Más de Sailing Squib
De Sailing Squib — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



