Sailing Squibvídeo

Squib's Refit - Preparations for Kiwigrip - Mounting deck hardware - Epoxy work /91

2 de noviembre de 2024 · 15 min · 738 visitas · Vienna

Qué cubre este vídeo

The refit of the boat Squib focuses on deck preparation, hardware installation, and structural repairs in high-temperature conditions. Work includes filling and sanding deck holes, smoothing previous epoxy repairs, and sanding the hull to remove paint runs and drips in preparation for applying KiwiGrip non-skid coating.2:02 The crew also reinforces the electric outboard motor mount by laminating fiberglass mats with epoxy.3:46 Hardware installation involves sealing deck fittings, such as genoa reefing line fairleads, using butyl tape to ensure a watertight seal.13:22 The process requires precise positioning of new hardware after filling old mounting holes.3:06 Interior work includes painting and finishing the galley cabinetry before final installation.8:56 The project involves iterative sanding and filling to achieve a smooth finish on both the exterior hull and interior components.8:07 The crew coordinates tasks to manage the heat and ensure surfaces are properly prepped for final coatings.0:04

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema