Sailing Squibvidéo
Squib's Refit - Preparations for Kiwigrip - Mounting deck hardware - Epoxy work /91
2 novembre 2024 · 15 min · 738 vues · Vienna
Ce que couvre cette vidéo
The refit of the boat Squib focuses on deck preparation, hardware installation, and structural repairs in high-temperature conditions. Work includes filling and sanding deck holes, smoothing previous epoxy repairs, and sanding the hull to remove paint runs and drips in preparation for applying KiwiGrip non-skid coating.2:02 The crew also reinforces the electric outboard motor mount by laminating fiberglass mats with epoxy.3:46 Hardware installation involves sealing deck fittings, such as genoa reefing line fairleads, using butyl tape to ensure a watertight seal.13:22 The process requires precise positioning of new hardware after filling old mounting holes.3:06 Interior work includes painting and finishing the galley cabinetry before final installation.8:56 The project involves iterative sanding and filling to achieve a smooth finish on both the exterior hull and interior components.8:07 The crew coordinates tasks to manage the heat and ensure surfaces are properly prepped for final coatings.0:04
Plus de vidéos de Sailing Squib
De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



