Entre Terras e Maresvideo
We completed and glued the navigation table T1. ep176
26. april 2026 · 29 min · 292 visninger
Hva denne videoen dekker
Edgar and Sâmia finalized the structural assembly of the navigation table on their boat, prioritizing the integration of electrical and electronic mounting surfaces.5:35 The project involved disassembling, re-gluing, and reinforcing the bulkhead structure with epoxy to increase rigidity.6:22 They installed a dedicated backing board behind the table to house essential components, including 12V chargers, solar MPPT controllers, and inverters.5:51 The team also positioned the SSB radio and planned the layout for the 12V and AC electrical panels.19:44 To ensure future maintenance access, they designed specific panels—such as those covering the hydraulic pump and engine throttle linkage—to remain removable rather than permanently bonded.26:19 The construction process required repeated adjustments, with the team frequently moving between the interior and exterior to cut and fit wood components to avoid excessive dust accumulation inside the cabin.24:46 The next phase of the project involves applying Formica finish to the completed structure.23:20
Mer fra Entre Terras e Mares
Fra Entre Terras e Mares – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



