Entre Terras e Maresvídeo
We completed and glued the navigation table T1. ep176
26 de abril de 2026 · 29 min · 292 visitas
Qué cubre este vídeo
Edgar and Sâmia finalized the structural assembly of the navigation table on their boat, prioritizing the integration of electrical and electronic mounting surfaces.5:35 The project involved disassembling, re-gluing, and reinforcing the bulkhead structure with epoxy to increase rigidity.6:22 They installed a dedicated backing board behind the table to house essential components, including 12V chargers, solar MPPT controllers, and inverters.5:51 The team also positioned the SSB radio and planned the layout for the 12V and AC electrical panels.19:44 To ensure future maintenance access, they designed specific panels—such as those covering the hydraulic pump and engine throttle linkage—to remain removable rather than permanently bonded.26:19 The construction process required repeated adjustments, with the team frequently moving between the interior and exterior to cut and fit wood components to avoid excessive dust accumulation inside the cabin.24:46 The next phase of the project involves applying Formica finish to the completed structure.23:20
Más de Entre Terras e Mares
De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



