sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión
sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026

InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión

Entre Terras e Mares · video

We completed and glued the navigation table T1. ep176

26 de abril de 2026 · 29 min · 288 vistas

Ver en YouTube

¿Qué cubre este video?

Edgar and Sâmia finalized the structural assembly of the navigation table on their boat, prioritizing the integration of electrical and electronic mounting surfaces.▶ 0:00 The project involved disassembling, re-gluing, and reinforcing the bulkhead structure with epoxy to increase rigidity.▶ 6:22 They installed a dedicated backing board behind the table to house essential components, including 12V chargers, solar MPPT controllers, and inverters.▶ 6:03 The team also positioned the SSB radio and planned the layout for the 12V and AC electrical panels.▶ 6:22 To ensure future maintenance access, they designed specific panels—such as those covering the hydraulic pump and engine throttle linkage—to remain removable rather than permanently bonded.▶ 7:19 The construction process required repeated adjustments, with the team frequently moving between the interior and exterior to cut and fit wood components to avoid excessive dust accumulation inside the cabin.▶ 24:46 The next phase of the project involves applying Formica finish to the completed structure.▶ 10:06

Más de Entre Terras e Mares

WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180may 2026

De Entre Terras e Mares — ve el barco, la tripulación y cada video analizado del canal.

Reportar un problema
InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026