sailing.directory
ChannelsBoatsAskAbout
🇬🇧
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in
sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026

HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory
ChannelsBoatsAskAbout
🇬🇧
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in

Entre Terras e Mares · video

We completed and glued the navigation table T1. ep176

26 April 2026 · 29 min · 288 views

Watch on YouTube

What this video covers

Edgar and Sâmia finalized the structural assembly of the navigation table on their boat, prioritizing the integration of electrical and electronic mounting surfaces.▶ 0:00 The project involved disassembling, re-gluing, and reinforcing the bulkhead structure with epoxy to increase rigidity.▶ 6:22 They installed a dedicated backing board behind the table to house essential components, including 12V chargers, solar MPPT controllers, and inverters.▶ 6:03 The team also positioned the SSB radio and planned the layout for the 12V and AC electrical panels.▶ 6:22 To ensure future maintenance access, they designed specific panels—such as those covering the hydraulic pump and engine throttle linkage—to remain removable rather than permanently bonded.▶ 7:19 The construction process required repeated adjustments, with the team frequently moving between the interior and exterior to cut and fit wood components to avoid excessive dust accumulation inside the cabin.▶ 24:46 The next phase of the project involves applying Formica finish to the completed structure.▶ 10:06

More from Entre Terras e Mares

WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180May 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.

Report an issue
HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026