Mais
Idioma
Modo de visualização
Entre Terras e Maresvídeo
26 de abril de 2026 · 29 min · 288 visualizações
O que este vídeo aborda
Edgar and Sâmia finalized the structural assembly of the navigation table on their boat, prioritizing the integration of electrical and electronic mounting surfaces.▶ 0:00 The project involved disassembling, re-gluing, and reinforcing the bulkhead structure with epoxy to increase rigidity.▶ 6:22 They installed a dedicated backing board behind the table to house essential components, including 12V chargers, solar MPPT controllers, and inverters.▶ 6:03 The team also positioned the SSB radio and planned the layout for the 12V and AC electrical panels.▶ 6:22 To ensure future maintenance access, they designed specific panels—such as those covering the hydraulic pump and engine throttle linkage—to remain removable rather than permanently bonded.▶ 7:19 The construction process required repeated adjustments, with the team frequently moving between the interior and exterior to cut and fit wood components to avoid excessive dust accumulation inside the cabin.▶ 24:46 The next phase of the project involves applying Formica finish to the completed structure.▶ 10:06
Mais de Entre Terras e Mares
De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.