Sailing Yabávideo
Getting Yabá ready for the Holidays 🎄 — Sailing Yabá 235
4. desember 2024 · 16 min · 43K visninger
Hva denne videoen dekker
The crew of Yabá relocates the boat to a more protected bay to avoid an incoming southern swell and potential storms.2:54 Before departing, they continue interior renovations, specifically focusing on the bathroom shower box.0:52 Ben installs a floor beam and support structure, while MP paints the surrounding walls with an off-white finish to cover imperfections.1:24 The project requires cutting dense Purple Heart wood planks to fit the shower basin and accordion door rail, necessitating the use of a multi-tool for tight corners.6:27 During the work, a DeWalt vacuum battery falls into saltwater; the crew attempts to salvage it by rinsing the unit in fresh water.7:36 After anchoring in the new, calmer bay, the crew takes the dogs ashore to walk through a eucalyptus grove.11:29 Work concludes with the application of a final coat of paint and preparations to seal the plywood shower components with epoxy and carbacil.14:25
Mer fra Sailing Yabá
Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



