Sailing Yabávideo

Getting Yabá ready for the Holidays 🎄 — Sailing Yabá 235

4 December 2024 · 16 min · 43K views

What this video covers

The crew of Yabá relocates the boat to a more protected bay to avoid an incoming southern swell and potential storms.2:54 Before departing, they continue interior renovations, specifically focusing on the bathroom shower box.0:52 Ben installs a floor beam and support structure, while MP paints the surrounding walls with an off-white finish to cover imperfections.1:24 The project requires cutting dense Purple Heart wood planks to fit the shower basin and accordion door rail, necessitating the use of a multi-tool for tight corners.6:27 During the work, a DeWalt vacuum battery falls into saltwater; the crew attempts to salvage it by rinsing the unit in fresh water.7:36 After anchoring in the new, calmer bay, the crew takes the dogs ashore to walk through a eucalyptus grove.11:29 Work concludes with the application of a final coat of paint and preparations to seal the plywood shower components with epoxy and carbacil.14:25

Watch on YouTube

More from Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSept 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing YabáSept 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáAug 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue