Sailing Yabávidéo
Getting Yabá ready for the Holidays 🎄 — Sailing Yabá 235
4 décembre 2024 · 16 min · 43K vues
Ce que couvre cette vidéo
The crew of Yabá relocates the boat to a more protected bay to avoid an incoming southern swell and potential storms.2:54 Before departing, they continue interior renovations, specifically focusing on the bathroom shower box.0:52 Ben installs a floor beam and support structure, while MP paints the surrounding walls with an off-white finish to cover imperfections.1:24 The project requires cutting dense Purple Heart wood planks to fit the shower basin and accordion door rail, necessitating the use of a multi-tool for tight corners.6:27 During the work, a DeWalt vacuum battery falls into saltwater; the crew attempts to salvage it by rinsing the unit in fresh water.7:36 After anchoring in the new, calmer bay, the crew takes the dogs ashore to walk through a eucalyptus grove.11:29 Work concludes with the application of a final coat of paint and preparations to seal the plywood shower components with epoxy and carbacil.14:25
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



