Sailing Yabávídeo
Getting Yabá ready for the Holidays 🎄 — Sailing Yabá 235
4 de dezembro de 2024 · 16 min · 43K visualizações
O que este vídeo aborda
The crew of Yabá relocates the boat to a more protected bay to avoid an incoming southern swell and potential storms.2:54 Before departing, they continue interior renovations, specifically focusing on the bathroom shower box.0:52 Ben installs a floor beam and support structure, while MP paints the surrounding walls with an off-white finish to cover imperfections.1:24 The project requires cutting dense Purple Heart wood planks to fit the shower basin and accordion door rail, necessitating the use of a multi-tool for tight corners.6:27 During the work, a DeWalt vacuum battery falls into saltwater; the crew attempts to salvage it by rinsing the unit in fresh water.7:36 After anchoring in the new, calmer bay, the crew takes the dogs ashore to walk through a eucalyptus grove.11:29 Work concludes with the application of a final coat of paint and preparations to seal the plywood shower components with epoxy and carbacil.14:25
Mais de Sailing Yabá
De Sailing Yabá — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



