Sailing Yabávídeo
Getting Yabá ready for the Holidays 🎄 — Sailing Yabá 235
4 de diciembre de 2024 · 16 min · 43K visitas
Qué cubre este vídeo
The crew of Yabá relocates the boat to a more protected bay to avoid an incoming southern swell and potential storms.2:54 Before departing, they continue interior renovations, specifically focusing on the bathroom shower box.0:52 Ben installs a floor beam and support structure, while MP paints the surrounding walls with an off-white finish to cover imperfections.1:24 The project requires cutting dense Purple Heart wood planks to fit the shower basin and accordion door rail, necessitating the use of a multi-tool for tight corners.6:27 During the work, a DeWalt vacuum battery falls into saltwater; the crew attempts to salvage it by rinsing the unit in fresh water.7:36 After anchoring in the new, calmer bay, the crew takes the dogs ashore to walk through a eucalyptus grove.11:29 Work concludes with the application of a final coat of paint and preparations to seal the plywood shower components with epoxy and carbacil.14:25
Más de Sailing Yabá
De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



