Sailing SV Delosvideo
12 WEEKS TRANSFORMATION đ€Ż Building Our Dream Boat From Scratch (Part 8)
11. oktober 2024 · 21 min · 273K visninger
Hva denne videoen dekker
Construction of the aluminum expedition catamaran, SV Delos 2.0, reaches the 12-week mark with the hull nearly complete and ready for a scheduled flip.Watch Fabricators installed the final hull plates after completing internal welding, using large circulation fans and air-supplied helmets to mitigate toxic aluminum welding fumes.2:17 To prevent buckling on 4mm topside plates, the team distributed heat by frequently shifting welding positions.3:19 When two plates cracked during a 90-degree bend at a local shop, the crew repaired them with additional welds and grinding, noting that a minimum bending radius of six times the material thickness is required to avoid stress fractures.9:53 The team also selected Hollypan 17mm honeycomb composite for the interior flooring after comparing weight, compression strength, and cost against plywood and other alternatives.16:43 This choice saves approximately 177 kilograms compared to the designer-specified plywood.18:46 The project remains on schedule for the upcoming hull flip.10:55
Mer fra Sailing SV Delos
Fra Sailing SV Delos â se kanalens bĂ„t, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Ăn e-post med flĂ„tens beste funn â Ăžyeblikkene, bĂ„tene og historiene som er verdt din seertid. Skriv inn din egen adresse for Ă„ fĂ„ din egen kopi.



