Sailing SV Delosvideo
12 WEEKS TRANSFORMATION 🤯 Building Our Dream Boat From Scratch (Part 8)
11 October 2024 · 21 min · 273K views
What this video covers
Construction of the aluminum expedition catamaran, SV Delos 2.0, reaches the 12-week mark with the hull nearly complete and ready for a scheduled flip.Watch Fabricators installed the final hull plates after completing internal welding, using large circulation fans and air-supplied helmets to mitigate toxic aluminum welding fumes.2:17 To prevent buckling on 4mm topside plates, the team distributed heat by frequently shifting welding positions.3:19 When two plates cracked during a 90-degree bend at a local shop, the crew repaired them with additional welds and grinding, noting that a minimum bending radius of six times the material thickness is required to avoid stress fractures.9:53 The team also selected Hollypan 17mm honeycomb composite for the interior flooring after comparing weight, compression strength, and cost against plywood and other alternatives.16:43 This choice saves approximately 177 kilograms compared to the designer-specified plywood.18:46 The project remains on schedule for the upcoming hull flip.10:55
More from Sailing SV Delos
From Sailing SV Delos — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



