12 WEEKS TRANSFORMATION 🤯 Building Our Dream Boat From Scratch (Part 8)

11 October 2024 · 21 min · 273K views

What this video covers

Construction of the aluminum expedition catamaran, SV Delos 2.0, reaches the 12-week mark with the hull nearly complete and ready for a scheduled flip.Watch Fabricators installed the final hull plates after completing internal welding, using large circulation fans and air-supplied helmets to mitigate toxic aluminum welding fumes.2:17 To prevent buckling on 4mm topside plates, the team distributed heat by frequently shifting welding positions.3:19 When two plates cracked during a 90-degree bend at a local shop, the crew repaired them with additional welds and grinding, noting that a minimum bending radius of six times the material thickness is required to avoid stress fractures.9:53 The team also selected Hollypan 17mm honeycomb composite for the interior flooring after comparing weight, compression strength, and cost against plywood and other alternatives.16:43 This choice saves approximately 177 kilograms compared to the designer-specified plywood.18:46 The project remains on schedule for the upcoming hull flip.10:55

Watch on YouTube

More from Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85Sept 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Aug 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83Aug 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82Aug 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue