Sailing SV Delosvídeo

12 WEEKS TRANSFORMATION 🤯 Building Our Dream Boat From Scratch (Part 8)

11 de outubro de 2024 · 21 min · 273K visualizações

O que este vídeo aborda

Construction of the aluminum expedition catamaran, SV Delos 2.0, reaches the 12-week mark with the hull nearly complete and ready for a scheduled flip.Watch Fabricators installed the final hull plates after completing internal welding, using large circulation fans and air-supplied helmets to mitigate toxic aluminum welding fumes.2:17 To prevent buckling on 4mm topside plates, the team distributed heat by frequently shifting welding positions.3:19 When two plates cracked during a 90-degree bend at a local shop, the crew repaired them with additional welds and grinding, noting that a minimum bending radius of six times the material thickness is required to avoid stress fractures.9:53 The team also selected Hollypan 17mm honeycomb composite for the interior flooring after comparing weight, compression strength, and cost against plywood and other alternatives.16:43 This choice saves approximately 177 kilograms compared to the designer-specified plywood.18:46 The project remains on schedule for the upcoming hull flip.10:55

Assistir no YouTube

Mais de Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85set. de 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84ago. de 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83ago. de 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82ago. de 2026

De Sailing SV Delos — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema