Sailing Yabávideo
Drilling important holes in a 2 inches wooden boat's hull — Sailing Yabá 177
23. januar 2024 · 27 min · 75K visninger
Hva denne videoen dekker
The crew of Yabá, a wooden boat currently in a shipyard, installs two new through-hull fittings for a marine toilet.9:03 The hull planking is 5 centimeters thick, requiring the use of a drill bit to pilot from the inside followed by a hole saw from both sides to ensure a clean cut.8:54 The inlet and outlet seacocks are positioned to remain accessible above the ballast while maintaining sufficient separation to prevent cross-contamination.16:14 After drilling, the crew seals the exposed wood within the holes using epoxy resin.19:30 The project also involves caulking the deck and keel, installing chain plates, and preparing the electrical panel for bilge pumps and a flood alarm.22:52 The crew decides against installing a bow thruster before the upcoming launch, opting to evaluate the need for one after sea trials.25:36
Mer fra Sailing Yabá
Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



