Sailing Yabávideo

Drilling important holes in a 2 inches wooden boat's hull — Sailing Yabá 177

23 gennaio 2024 · 27 min · 75K visualizzazioni

Cosa tratta questo video

The crew of Yabá, a wooden boat currently in a shipyard, installs two new through-hull fittings for a marine toilet.9:03 The hull planking is 5 centimeters thick, requiring the use of a drill bit to pilot from the inside followed by a hole saw from both sides to ensure a clean cut.8:54 The inlet and outlet seacocks are positioned to remain accessible above the ballast while maintaining sufficient separation to prevent cross-contamination.16:14 After drilling, the crew seals the exposed wood within the holes using epoxy resin.19:30 The project also involves caulking the deck and keel, installing chain plates, and preparing the electrical panel for bilge pumps and a flood alarm.22:52 The crew decides against installing a bow thruster before the upcoming launch, opting to evaluate the need for one after sea trials.25:36

Guarda su YouTube

Altro da Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáott 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáott 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabáset 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabáset 2026

Da Sailing Yabá — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema