Sailing Yabávidéo

Drilling important holes in a 2 inches wooden boat's hull — Sailing Yabá 177

23 janvier 2024 · 27 min · 75K vues

Ce que couvre cette vidéo

The crew of Yabá, a wooden boat currently in a shipyard, installs two new through-hull fittings for a marine toilet.9:03 The hull planking is 5 centimeters thick, requiring the use of a drill bit to pilot from the inside followed by a hole saw from both sides to ensure a clean cut.8:54 The inlet and outlet seacocks are positioned to remain accessible above the ballast while maintaining sufficient separation to prevent cross-contamination.16:14 After drilling, the crew seals the exposed wood within the holes using epoxy resin.19:30 The project also involves caulking the deck and keel, installing chain plates, and preparing the electrical panel for bilge pumps and a flood alarm.22:52 The crew decides against installing a bow thruster before the upcoming launch, opting to evaluate the need for one after sea trials.25:36

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct. 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct. 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásept. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept. 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème