Sailing Yabávideo

Drilling important holes in a 2 inches wooden boat's hull — Sailing Yabá 177

January 23, 2024 · 27 min · 75K views

What this video covers

The crew of Yabá, a wooden boat currently in a shipyard, installs two new through-hull fittings for a marine toilet.9:03 The hull planking is 5 centimeters thick, requiring the use of a drill bit to pilot from the inside followed by a hole saw from both sides to ensure a clean cut.8:54 The inlet and outlet seacocks are positioned to remain accessible above the ballast while maintaining sufficient separation to prevent cross-contamination.16:14 After drilling, the crew seals the exposed wood within the holes using epoxy resin.19:30 The project also involves caulking the deck and keel, installing chain plates, and preparing the electrical panel for bilge pumps and a flood alarm.22:52 The crew decides against installing a bow thruster before the upcoming launch, opting to evaluate the need for one after sea trials.25:36

Watch on YouTube

More from Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing YabáOct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing YabáOct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSep 2026

From Sailing Yabá — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue