Sailing Yabávídeo

Drilling important holes in a 2 inches wooden boat's hull — Sailing Yabá 177

23 de enero de 2024 · 27 min · 75K visitas

Qué cubre este vídeo

The crew of Yabá, a wooden boat currently in a shipyard, installs two new through-hull fittings for a marine toilet.9:03 The hull planking is 5 centimeters thick, requiring the use of a drill bit to pilot from the inside followed by a hole saw from both sides to ensure a clean cut.8:54 The inlet and outlet seacocks are positioned to remain accessible above the ballast while maintaining sufficient separation to prevent cross-contamination.16:14 After drilling, the crew seals the exposed wood within the holes using epoxy resin.19:30 The project also involves caulking the deck and keel, installing chain plates, and preparing the electrical panel for bilge pumps and a flood alarm.22:52 The crew decides against installing a bow thruster before the upcoming launch, opting to evaluate the need for one after sea trials.25:36

Ver en YouTube

Más de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept 2026

De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema