Wildling Sailingvideo

I Built A Cockpit Floor for My Ocean-Going Catamaran | Wildling Sailing

23. februar 2024 · 27 min · 125K visninger

Hva denne videoen dekker

Fabricating a metal cage and cockpit floor for an ocean-going catamaran requires drilling through steel, a task significantly improved by switching from standard drill bits to cobalt bits.12:54 The project involves installing structural bars in situ to support engine boxes, with the goal of creating a flat, functional deck.7:45 Initial attempts to drill with standard bits resulted in snapped cutting edges, but cobalt bits allow for faster, more efficient progress.13:29 The current design relies on M10 bolts to secure the cage, though plans include upgrading to M12 bolts and adding lashing for increased structural integrity.23:26 The builder intends to conceal the metal framework with a wooden platform and engine bay lids.24:11 Beyond the structural work, the project includes troubleshooting a fuel delivery issue on a 9.9hp outboard engine for a new dinghy and preparing to install a CNC-milled mast step.26:13 The ultimate objective is to reach a seaworthy state for a summer cruise in the North Sea and Friesland.24:43

Se på YouTube

Mer fra Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitokt. 2026I Lifted Her Out For a Very Important Rebuild.sep. 2026One Final Refit Before Crossing The Atlantic.aug. 20262 Days Alone at Sea On my Primitive Double-Canoe.aug. 2026

Fra Wildling Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem