Wildling Sailingvídeo
I Built A Cockpit Floor for My Ocean-Going Catamaran | Wildling Sailing
23 de febrero de 2024 · 27 min · 125K visitas
Qué cubre este vídeo
Fabricating a metal cage and cockpit floor for an ocean-going catamaran requires drilling through steel, a task significantly improved by switching from standard drill bits to cobalt bits.12:54 The project involves installing structural bars in situ to support engine boxes, with the goal of creating a flat, functional deck.7:45 Initial attempts to drill with standard bits resulted in snapped cutting edges, but cobalt bits allow for faster, more efficient progress.13:29 The current design relies on M10 bolts to secure the cage, though plans include upgrading to M12 bolts and adding lashing for increased structural integrity.23:26 The builder intends to conceal the metal framework with a wooden platform and engine bay lids.24:11 Beyond the structural work, the project includes troubleshooting a fuel delivery issue on a 9.9hp outboard engine for a new dinghy and preparing to install a CNC-milled mast step.26:13 The ultimate objective is to reach a seaworthy state for a summer cruise in the North Sea and Friesland.24:43
Más de Wildling Sailing
De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



