Wildling Sailingvideo
I Built A Cockpit Floor for My Ocean-Going Catamaran | Wildling Sailing
February 23, 2024 · 27 min · 125K views
What this video covers
Fabricating a metal cage and cockpit floor for an ocean-going catamaran requires drilling through steel, a task significantly improved by switching from standard drill bits to cobalt bits.12:54 The project involves installing structural bars in situ to support engine boxes, with the goal of creating a flat, functional deck.7:45 Initial attempts to drill with standard bits resulted in snapped cutting edges, but cobalt bits allow for faster, more efficient progress.13:29 The current design relies on M10 bolts to secure the cage, though plans include upgrading to M12 bolts and adding lashing for increased structural integrity.23:26 The builder intends to conceal the metal framework with a wooden platform and engine bay lids.24:11 Beyond the structural work, the project includes troubleshooting a fuel delivery issue on a 9.9hp outboard engine for a new dinghy and preparing to install a CNC-milled mast step.26:13 The ultimate objective is to reach a seaworthy state for a summer cruise in the North Sea and Friesland.24:43
More from Wildling Sailing
From Wildling Sailing — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



