Wildling Sailingvídeo

I Built A Cockpit Floor for My Ocean-Going Catamaran | Wildling Sailing

23 de fevereiro de 2024 · 27 min · 125K visualizações

O que este vídeo aborda

Fabricating a metal cage and cockpit floor for an ocean-going catamaran requires drilling through steel, a task significantly improved by switching from standard drill bits to cobalt bits.12:54 The project involves installing structural bars in situ to support engine boxes, with the goal of creating a flat, functional deck.7:45 Initial attempts to drill with standard bits resulted in snapped cutting edges, but cobalt bits allow for faster, more efficient progress.13:29 The current design relies on M10 bolts to secure the cage, though plans include upgrading to M12 bolts and adding lashing for increased structural integrity.23:26 The builder intends to conceal the metal framework with a wooden platform and engine bay lids.24:11 Beyond the structural work, the project includes troubleshooting a fuel delivery issue on a 9.9hp outboard engine for a new dinghy and preparing to install a CNC-milled mast step.26:13 The ultimate objective is to reach a seaworthy state for a summer cruise in the North Sea and Friesland.24:43

Assistir no YouTube

Mais de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitout. de 2026I Lifted Her Out For a Very Important Rebuild.set. de 2026One Final Refit Before Crossing The Atlantic.ago. de 20262 Days Alone at Sea On my Primitive Double-Canoe.ago. de 2026

De Wildling Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema