Hold Fast!vídeo

S/V SeaSprite Refit Update - Side and Foredeck Re-coring Complete

29 de agosto de 2023 · 2 min · 595 visualizações

O que este vídeo aborda

Side deck re-coring on a Sea SPRITE 30 is complete port and starboard, but the project has paused mid-refit due to a contractor ownership transition.0:26 Work stopped at the slick-sanding stage, just before non-skid paint application.0:40 The coach roof still has elevated moisture readings, concentrated around the handrails, and requires additional re-coring.0:53 A second area of concern sits at the transom near the lazarette, where two cleats produced high moisture meter readings; Lizzie plans to pull a core sample there to determine whether that section also needs re-coring.1:32 The original gelcoat on the coach roof is worn through and will need paint regardless.1:05 The new contractor owners are expected to continue the work once the business transition completes.0:21 No timeline for resumption is given.

Assistir no YouTube

Barcos neste vídeo

Sea SPRITE 30O barco delesCabo RICO 38O barco delesCabo RICO 56O barco deles

Mais de Hold Fast!

S/V SeaSprite Refit Update 4 Oct 2026out. de 2026Hinckley Bermuda 40 MKIII Survey & Sea Trial out. de 2026S/V SeaSprite Refit Update 18-20 Sep 2026set. de 2026S/V SeaSprite Refit Update 9 September 2026set. de 2026

De Hold Fast! — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema