Sven Yrvindvídeo

24 Dec 2023 Swim ladder hinges a new approach

24 de dezembro de 2023 · 7 min · 3K visualizações · Sweden

O que este vídeo aborda

Sven Yrvind modifies the swim ladder on his boat to improve access for hull cleaning during his planned voyage to New Zealand.0:06 The existing rope-based hinge system frequently jams and interferes with the rubber hull components, complicating deployment.0:10 To resolve this, he cuts away the original mounting points and prepares to weld new hinges directly into the composite structure.0:33 This relocation allows for easier access to the hull, which he identifies as a critical requirement for removing goose barnacles in the Roaring Forties.3:57 Although the modification delays the boat's launch date, he prioritizes long-term maintenance efficiency over immediate departure.5:16 He uses a saw and grinder to create new slots in the composite, planning to reinforce the area after welding the hinges into their new positions.6:49 Improving hull access for cleaning at sea reduces the risk of performance loss caused by barnacle accumulation during long-distance passages.6:13

Assistir no YouTube

Mais de Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.out. de 2026Nervously Cutting the Divinycell Sheets.out. de 2026Trying to Get the Sheerline Right.out. de 2026More molds up.out. de 2026

De Sven Yrvind — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema