Sven Yrvindvídeo

Back to Work.

7 de setembro de 2026 · 4 min · 4K visualizações

O que este vídeo aborda

Yrvind continues construction on a high-latitude boat in a large workshop facility.Watch The project requires additional components, necessitating a trip to a nearby supplier located 50 meters from the workspace.3:12 The boat’s mast measures 3.9 meters, but the total height including the trailer exceeds the workshop door clearance.3:31 Consequently, the mast and booms require removal before the vessel can be moved for transport.3:56 Daily deliveries of materials and parts continue to arrive at the site to support the ongoing build.3:21

Ver no YouTube

Mais de Sven Yrvind

2 Masts down, ready for the trailer.09/2026A Non Bloated Boat in a Bloated World.09/2026No access to boat sat and sunday.09/2026Fixing water collection and trailer adaption.09/2026

De Sven Yrvind — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema