Sven Yrvindvidéo

Back to Work.

7 septembre 2026 · 4 min · 4K vues

Ce que couvre cette vidéo

Yrvind continues construction on a high-latitude boat in a large workshop facility.Watch The project requires additional components, necessitating a trip to a nearby supplier located 50 meters from the workspace.3:12 The boat’s mast measures 3.9 meters, but the total height including the trailer exceeds the workshop door clearance.3:31 Consequently, the mast and booms require removal before the vessel can be moved for transport.3:56 Daily deliveries of materials and parts continue to arrive at the site to support the ongoing build.3:21

Regarder sur YouTube

Plus de vidéos de Sven Yrvind

2 Masts down, ready for the trailer.sept. 2026A Non Bloated Boat in a Bloated World.sept. 2026No access to boat sat and sunday.sept. 2026Fixing water collection and trailer adaption.sept. 2026

De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème