Sven Yrvindvídeo

2 Masts down, ready for the trailer.

8 de setembro de 2026 · 2 min · 5K visualizações

O que este vídeo aborda

Sven Yrvind prepares his boat for transport by lowering the two foremasts and the boom.0:53 He secures the spars using knots and black lifting ropes to ensure they remain stationary during transit.1:03 The boom requires additional clearance and a secondary knob to improve stability, though he prioritizes launching the boat over making these mechanical refinements.0:14 He removes the wheels and adjusts the screws to finalize the configuration for the trailer.1:55 The process highlights the iterative nature of boat rigging, where initial tolerances often require adjustment after the first assembly.

Ver no YouTube

Mais de Sven Yrvind

Back to Work.09/2026A Non Bloated Boat in a Bloated World.09/2026No access to boat sat and sunday.09/2026Fixing water collection and trailer adaption.09/2026

De Sven Yrvind — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema