Epiphany Sailingvídeo

DIY replaced our failing Topping Lift supporting our boom C&C 39 Sailboat

1 de novembro de 2024 · 10 min · 318 visualizações

O que este vídeo aborda

A C&C 39 sailboat owner replaces a failing topping lift after discovering multiple broken wire strands during a rigging inspection.0:24 The original 1/8-inch cable is upgraded to 3/16-inch stainless steel wire to improve durability.0:57 To perform the replacement, the owner supports the boom using the mainsail halyard, climbs the mast to disconnect the old cable, and installs the new line.3:28 The project utilizes a battery cable crimper to secure aluminum ferrules on the stainless steel wire, creating an eye at both ends.2:50 The owner secures the masthead shackle with a zip tie to prevent it from vibrating loose.5:20 By performing the work independently, the owner estimates a savings of $300 to $500 compared to professional rigging shop costs.3:10 The new topping lift remains adjustable at the boom, allowing for sail shape control in varying wind conditions.9:43 Regular rigging inspections are essential to identify wire fatigue before catastrophic failure occurs at sea.7:41

Ver no YouTube

Barcos neste vídeo

C&C Yachts 39O barco deles

Mais de Epiphany Sailing

YOWZA ITS A THUNDERSTORM SHOWER!!!09/2026Bris 12 ft dinghy floor board repairs 04/2026Space X Rocket over Georgetown Exumas Bahamas 2/19/202602/202650 knot Blow Georgetown Exumas saved by Backup Snubber!02/2026

De Epiphany Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema