Epiphany Sailingvideo
DIY replaced our failing Topping Lift supporting our boom C&C 39 Sailboat
November 1, 2024 · 10 min · 318 views
What this video covers
A C&C 39 sailboat owner replaces a failing topping lift after discovering multiple broken wire strands during a rigging inspection.0:24 The original 1/8-inch cable is upgraded to 3/16-inch stainless steel wire to improve durability.0:57 To perform the replacement, the owner supports the boom using the mainsail halyard, climbs the mast to disconnect the old cable, and installs the new line.3:28 The project utilizes a battery cable crimper to secure aluminum ferrules on the stainless steel wire, creating an eye at both ends.2:50 The owner secures the masthead shackle with a zip tie to prevent it from vibrating loose.5:20 By performing the work independently, the owner estimates a savings of $300 to $500 compared to professional rigging shop costs.3:10 The new topping lift remains adjustable at the boom, allowing for sail shape control in varying wind conditions.9:43 Regular rigging inspections are essential to identify wire fatigue before catastrophic failure occurs at sea.7:41
Boats in this video
More from Epiphany Sailing
From Epiphany Sailing — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



