Epiphany Sailingvidéo

DIY replaced our failing Topping Lift supporting our boom C&C 39 Sailboat

1 novembre 2024 · 10 min · 318 vues

Ce que couvre cette vidéo

A C&C 39 sailboat owner replaces a failing topping lift after discovering multiple broken wire strands during a rigging inspection.0:24 The original 1/8-inch cable is upgraded to 3/16-inch stainless steel wire to improve durability.0:57 To perform the replacement, the owner supports the boom using the mainsail halyard, climbs the mast to disconnect the old cable, and installs the new line.3:28 The project utilizes a battery cable crimper to secure aluminum ferrules on the stainless steel wire, creating an eye at both ends.2:50 The owner secures the masthead shackle with a zip tie to prevent it from vibrating loose.5:20 By performing the work independently, the owner estimates a savings of $300 to $500 compared to professional rigging shop costs.3:10 The new topping lift remains adjustable at the boom, allowing for sail shape control in varying wind conditions.9:43 Regular rigging inspections are essential to identify wire fatigue before catastrophic failure occurs at sea.7:41

Regarder sur YouTube

Bateaux dans cette vidéo

C&C Yachts 39Leur bateau

Plus de vidéos de Epiphany Sailing

YOWZA ITS A THUNDERSTORM SHOWER!!!sept. 2026Bris 12 ft dinghy floor board repairs avr. 2026Space X Rocket over Georgetown Exumas Bahamas 2/19/2026févr. 202650 knot Blow Georgetown Exumas saved by Backup Snubber!févr. 2026

De Epiphany Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème