BoatworksTodayvídeo
BACK ON THE BERTRAM MOPPIE RESTORATION, SHOP IS DONE!
19 de dezembro de 2021 · 20 min · 33K visualizações
O que este vídeo aborda
Andy resumes the restoration of a 1972 Bertram Moppy 25, a project previously stalled for several years.0:26 The boat, originally equipped with twin inboards, features an aftermarket Armstrong bracket for twin outboards.2:31 Initial structural repairs focused on the foredeck, which suffered from severe flexing and stress cracking due to poor previous workmanship involving 5200 sealant and screws.4:11 Andy removed the compromised sections and reinforced the deck with two full layers of 1708 fiberglass cloth.9:03 Future work will target the cockpit and transom before finalizing the interior layout.12:55 Before resuming lamination, Andy tests the shelf life of stored polyester laminating resin and gel coat by mixing small batches catalyzed at 2% with MAC hardener.14:57 He confirms the materials cure properly despite being stored for approximately one year.18:34 The project strategy prioritizes completing all structural fiberglass work across the entire vessel before beginning any cosmetic finishing.9:22
Mais de BoatworksToday
De BoatworksToday — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



