sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in
sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026

HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in

Classic Yacht TV · video

EP09 Positioning laminated floors and frames, summer recap #3: Building the schooner Malabar IV

December 14, 2025 · 19 min · 8K views · Cornwall

Watch on YouTube

What this video covers

Emily Harris installs the final laminated floor on the schooner Malabar IV, a critical structural component positioned directly below the main mast step.▶ 0:19 The floor's long arms are designed to transfer ballast keel loads into the frames and distribute rigging strain up to the deck and chain plates.▶ 0:30 Harris beds the floor with bitumen mastic, uses cotton caulking grommets under the bolt washers to seal the bolt holes against water ingress, and torques the bolts down before the paired frames are lifted into place.▶ 3:19 The frames at this mast-step section are 3 inches thick rather than the standard 2¾ inches, reflecting the concentrated rigging and heeling loads at that station.▶ 4:56 Harris explains why floor arm lengths are deliberately staggered — to avoid a continuous stress line at the frame-to-keel transition, analogous to staggering courses in brickwork.▶ 11:33 Being a two-masted schooner, Malabar IV requires the same structural reinforcement repeated at the foremast position.▶ 4:45 Volunteer crew member Sam, a joinery student, completes his final day chiseling the rabbet before departing; French volunteer Remy has returned for a second stint.▶ 9:35 Harris also notes she is now ready to actively seek a buyer for the completed vessel.▶ 8:49

More from Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IVMay 2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IVJan 2026EP08 Making laminated frames, last timber floor, summer recap #2: Building the schooner Malabar IVDec 2025EP07 Building the schooner Malabar IV | Summer recap #1Nov 2025

From Classic Yacht TV — see the channel’s boat, crew, and every analyzed video.

Report an issue
HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026