sailing.directory
CanaisBarcosPerguntarSobre
🇧🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Entrar
sailing.directory

Um índice dos canais de vela no YouTube — buscável por tema, navegável por interesse. Novos canais e barcos, indexados toda semana. Sem ruído.

Explorar

CanaisBarcosBuscarSobreSugerir um canal

Criadores e informações legais

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é um conselho de navegação · © 2026

InícioCanaisBarcos

Mais

BuscarPerguntarSobreApoiarPara criadoresEntrar

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de exibição

sailing.directory
CanaisBarcosPerguntarSobre
🇧🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Entrar

Classic Yacht TV · vídeo

EP09 Positioning laminated floors and frames, summer recap #3: Building the schooner Malabar IV

14 de dezembro de 2025 · 19 min · 8K visualizações · Cornwall

Assistir no YouTube

O que este vídeo aborda

Emily Harris installs the final laminated floor on the schooner Malabar IV, a critical structural component positioned directly below the main mast step.▶ 0:19 The floor's long arms are designed to transfer ballast keel loads into the frames and distribute rigging strain up to the deck and chain plates.▶ 0:30 Harris beds the floor with bitumen mastic, uses cotton caulking grommets under the bolt washers to seal the bolt holes against water ingress, and torques the bolts down before the paired frames are lifted into place.▶ 3:19 The frames at this mast-step section are 3 inches thick rather than the standard 2¾ inches, reflecting the concentrated rigging and heeling loads at that station.▶ 4:56 Harris explains why floor arm lengths are deliberately staggered — to avoid a continuous stress line at the frame-to-keel transition, analogous to staggering courses in brickwork.▶ 11:33 Being a two-masted schooner, Malabar IV requires the same structural reinforcement repeated at the foremast position.▶ 4:45 Volunteer crew member Sam, a joinery student, completes his final day chiseling the rabbet before departing; French volunteer Remy has returned for a second stint.▶ 9:35 Harris also notes she is now ready to actively seek a buyer for the completed vessel.▶ 8:49

Mais de Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IVmai. de 2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IVjan. de 2026EP08 Making laminated frames, last timber floor, summer recap #2: Building the schooner Malabar IVdez. de 2025EP07 Building the schooner Malabar IV | Summer recap #1nov. de 2025

De Classic Yacht TV — veja o barco, a tripulação e cada vídeo analisado do canal.

Reportar um problema
InícioCanaisBarcos

Mais

BuscarPerguntarSobreApoiarPara criadoresEntrar

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de exibição

sailing.directory

Um índice dos canais de vela no YouTube — buscável por tema, navegável por interesse. Novos canais e barcos, indexados toda semana. Sem ruído.

Explorar

CanaisBarcosBuscarSobreSugerir um canal

Criadores e informações legais

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é um conselho de navegação · © 2026