sailing.directory
ChaînesBateauxDemanderÀ propos
🇫🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Se connecter
sailing.directory

Un index des chaînes de voile sur YouTube — interrogeable par sujet, navigable par centre d'intérêt. Nouvelles chaînes et nouveaux bateaux, indexés chaque semaine. Sans bruit.

Explorer

ChaînesBateauxRechercheÀ proposSuggérer une chaîne

Créateurs & mentions légales

SoutenirPour les créateursConfidentialitéConditionsDMCA

Ceci n'est pas un conseil de navigation · © 2026

AccueilChaînesBateaux

Plus

RechercheDemanderÀ proposSoutenirPour les créateursSe connecter

Langue

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Mode d'affichage

sailing.directory
ChaînesBateauxDemanderÀ propos
🇫🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Se connecter

Classic Yacht TV · vidéo

EP09 Positioning laminated floors and frames, summer recap #3: Building the schooner Malabar IV

14 décembre 2025 · 19 min · 8K vues · Cornwall

Regarder sur YouTube

Ce que couvre cette vidéo

Emily Harris installs the final laminated floor on the schooner Malabar IV, a critical structural component positioned directly below the main mast step.▶ 0:19 The floor's long arms are designed to transfer ballast keel loads into the frames and distribute rigging strain up to the deck and chain plates.▶ 0:30 Harris beds the floor with bitumen mastic, uses cotton caulking grommets under the bolt washers to seal the bolt holes against water ingress, and torques the bolts down before the paired frames are lifted into place.▶ 3:19 The frames at this mast-step section are 3 inches thick rather than the standard 2¾ inches, reflecting the concentrated rigging and heeling loads at that station.▶ 4:56 Harris explains why floor arm lengths are deliberately staggered — to avoid a continuous stress line at the frame-to-keel transition, analogous to staggering courses in brickwork.▶ 11:33 Being a two-masted schooner, Malabar IV requires the same structural reinforcement repeated at the foremast position.▶ 4:45 Volunteer crew member Sam, a joinery student, completes his final day chiseling the rabbet before departing; French volunteer Remy has returned for a second stint.▶ 9:35 Harris also notes she is now ready to actively seek a buyer for the completed vessel.▶ 8:49

Plus de vidéos de Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IVmai 2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IVjanv. 2026EP08 Making laminated frames, last timber floor, summer recap #2: Building the schooner Malabar IVdéc. 2025EP07 Building the schooner Malabar IV | Summer recap #1nov. 2025

De Classic Yacht TV — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

Signaler un problème
AccueilChaînesBateaux

Plus

RechercheDemanderÀ proposSoutenirPour les créateursSe connecter

Langue

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Mode d'affichage

sailing.directory

Un index des chaînes de voile sur YouTube — interrogeable par sujet, navigable par centre d'intérêt. Nouvelles chaînes et nouveaux bateaux, indexés chaque semaine. Sans bruit.

Explorer

ChaînesBateauxRechercheÀ proposSuggérer une chaîne

Créateurs & mentions légales

SoutenirPour les créateursConfidentialitéConditionsDMCA

Ceci n'est pas un conseil de navigation · © 2026