sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in
sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026

HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in

Sailing Squib · video

Sailing Squib - Den Rest erledigen wir dann unterwegs - Schleuse Djerdap 2 - Spätsommer /15

January 29, 2026 · 21 min · 1K views · Danube River near Iron Gates II Dam

Watch on YouTube

What this video covers

Sailing Squib's pocket catamaran Squib, crewed by Sabina and Peter, navigates a two-day stretch of the Danube through Serbia and Romania in late summer, covering 113 km on the second day alone. The first day brings strong headwinds and steep waves that hold speed below 8 km/h; the crew anchors at 19:30 on the Romanian bank after a guarded Serbian bay refuses overnight stays.▶ 4:01 A starter key failure is diagnosed and fixed quickly from a spare-parts box.▶ 5:58 The second day opens on mirror-flat water, and the crew transits Schleuse Djerdap 2 (lock km 867) by hailing on VHF channels 16 and 10 before the Romanian side responds; they enter the smaller of two lock chambers and drop 15 meters.▶ 10:22 Below the lock, a swim stop in 24.9°C water at 4 km/h current requires a fender on a long rope to prevent drifting.▶ 12:50 During the stop, the crew discovers the electric outboard's propeller has sheared off — likely from debris — explaining earlier reduced thrust.▶ 14:00 The crew notes that below Djerdap 2, all remaining bridges clear a 13.5-meter mast, making the route to the Danube Delta viable for sailboats with standing rigs.▶ 16:51

More from Sailing Squib

Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33Jun 2026Sailing Squib - We'll take care of the rest on the way - Last leg together /31May 2026Sailing Squib - We'll take care of the rest on the way - Chalkis to Cape Sounion /30May 2026Sailing Squib - We'll take care of the rest along the way - Autumn is catching up with us /29May 2026

From Sailing Squib — see the channel’s boat, crew, and every analyzed video.

Report an issue
HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026