RAN Sailingvideo
Halfway Done! Exterior Lamination Progress On Our 50ft Sailboat - Ep. 375 RAN Sailing
December 15, 2023 · 19 min · 108K views · Skåne
What this video covers
Laminating the hull of a 50-foot custom sailboat requires specific tools and temperature management to minimize air bubbles in the fiberglass. The builders use a combination of finned rollers for rapid saturation on a table, washer rollers to apply high pressure on the hull, and bristle rollers to remove trapped air.1:56 To prevent air from expanding out of the cedar core during the lamination process, the crew maintains a high barn temperature initially, then lowers the thermostat by one degree for each fiberglass length applied.14:50 This cooling technique, combined with a final overnight cure at 11–12 degrees Celsius, significantly reduces air bubble formation.15:57 The team uses a 650-millimeter overlap past the keel pocket to achieve double laminate thickness on the bottom of the hull.8:35 Total heating costs for the winter lamination project, including diesel and electricity, are estimated at approximately 1,500 US dollars.17:45 The builders aim to complete the exterior hull lamination by the end of the year before turning the boat in early spring.6:56
More from RAN Sailing
From RAN Sailing — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



