Sven Yrvindvideo

21 Nov 2025 Doing guiding pegs

November 20, 2025 · 6 min · 2K views · Sweden

What this video covers

Sven Yrvind fabricates and installs wooden pegs for a boat project during the Swedish winter. He uses 23-millimeter wooden stock and a 22-millimeter drill bit, refining the fit by turning the pegs on a lathe until they slide smoothly into the drilled holes.1:48 To secure the joints, he applies epoxy and uses sandpaper to ensure a precise fit.2:45 During the drilling process, he encounters a bronze screw embedded in the material, which leaves visible copper traces at the bottom of the hole.4:38 When installing the pegs, trapped air in the tight-fitting joints causes them to push back out, requiring repeated tapping until the air escapes and the seam stabilizes.5:41 The work takes place in a workshop environment while snow accumulates outside.

Watch on YouTube

More from Sven Yrvind

Aft Sail Up.Sep 2026Two Sails Up.Sep 2026The Boat Is Out of the Workshop.Aug 2026Ready for Masts and Sails.Aug 2026

From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue