Sam Holmes Sailingβίντεο

Finishing the rigging and lifting the mast w/ Rolly Tasker rigging services in Phuket

30 Νοεμβρίου 2025 · 6 λεπτά · 32K προβολές · Phuket

Τι καλύπτει αυτό το βίντεο

Sam Holmes replaces the forestay wire on his boat in Phuket, Thailand, utilizing professional rigging services from Rolly Tasker.Watch The process involves inspecting existing aluminum extrusions for the sail track and reassembling them onto the new wire using set screws and Loctite.0:25 The rigger installs a mechanical terminator on the forestay end by spacing the wire strands around a central wedge, applying anti-seize to prevent galling, and sealing the assembly with Sikaflex for water resistance.1:32 The Profurl furling drum is inspected and reattached to the base of the forestay.0:45 Before stepping the mast, the mast track is cleaned to ensure smooth slide movement, and the mast base ball is lubricated with PTFE grease.2:49 A crane lifts the mast into position, where the crew secures the forestay and shrouds.4:33 Final tuning of the standing rigging remains to be completed after the initial installation.6:07

Παρακολουθήστε στο YouTube

Περισσότερα από το Sam Holmes Sailing

Sailing to Maratua, a rarely visited Indonesian island Σεπ 2026We hit a log sailing by strange Indonesian sea platformsΑυγ 2026Replacing a window while sailing through pirate waters and wildlife of BorneoΑυγ 2026Sandakan and Wildlife of BorneoΑυγ 2026

Από Sam Holmes Sailing — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος