Sam Holmes Sailingvídeo

Finishing the rigging and lifting the mast w/ Rolly Tasker rigging services in Phuket

30 de noviembre de 2025 · 6 min · 32K visitas · Phuket

Qué cubre este vídeo

Sam Holmes replaces the forestay wire on his boat in Phuket, Thailand, utilizing professional rigging services from Rolly Tasker.Watch The process involves inspecting existing aluminum extrusions for the sail track and reassembling them onto the new wire using set screws and Loctite.0:25 The rigger installs a mechanical terminator on the forestay end by spacing the wire strands around a central wedge, applying anti-seize to prevent galling, and sealing the assembly with Sikaflex for water resistance.1:32 The Profurl furling drum is inspected and reattached to the base of the forestay.0:45 Before stepping the mast, the mast track is cleaned to ensure smooth slide movement, and the mast base ball is lubricated with PTFE grease.2:49 A crane lifts the mast into position, where the crew secures the forestay and shrouds.4:33 Final tuning of the standing rigging remains to be completed after the initial installation.6:07

Ver en YouTube

Más de Sam Holmes Sailing

Sailing to Maratua, a rarely visited Indonesian island sept 2026We hit a log sailing by strange Indonesian sea platformsago 2026Replacing a window while sailing through pirate waters and wildlife of Borneoago 2026Sandakan and Wildlife of Borneoago 2026

De Sam Holmes Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema