Sam Holmes Sailingvideo
Finishing the rigging and lifting the mast w/ Rolly Tasker rigging services in Phuket
November 30, 2025 · 6 min · 32K views · Phuket
What this video covers
Sam Holmes replaces the forestay wire on his boat in Phuket, Thailand, utilizing professional rigging services from Rolly Tasker.Watch The process involves inspecting existing aluminum extrusions for the sail track and reassembling them onto the new wire using set screws and Loctite.0:25 The rigger installs a mechanical terminator on the forestay end by spacing the wire strands around a central wedge, applying anti-seize to prevent galling, and sealing the assembly with Sikaflex for water resistance.1:32 The Profurl furling drum is inspected and reattached to the base of the forestay.0:45 Before stepping the mast, the mast track is cleaned to ensure smooth slide movement, and the mast base ball is lubricated with PTFE grease.2:49 A crane lifts the mast into position, where the crew secures the forestay and shrouds.4:33 Final tuning of the standing rigging remains to be completed after the initial installation.6:07
More from Sam Holmes Sailing
From Sam Holmes Sailing — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



