Sam Holmes Sailingvídeo

Finishing the rigging and lifting the mast w/ Rolly Tasker rigging services in Phuket

30 de novembro de 2025 · 6 min · 32K visualizações · Phuket

O que este vídeo aborda

Sam Holmes replaces the forestay wire on his boat in Phuket, Thailand, utilizing professional rigging services from Rolly Tasker.Watch The process involves inspecting existing aluminum extrusions for the sail track and reassembling them onto the new wire using set screws and Loctite.0:25 The rigger installs a mechanical terminator on the forestay end by spacing the wire strands around a central wedge, applying anti-seize to prevent galling, and sealing the assembly with Sikaflex for water resistance.1:32 The Profurl furling drum is inspected and reattached to the base of the forestay.0:45 Before stepping the mast, the mast track is cleaned to ensure smooth slide movement, and the mast base ball is lubricated with PTFE grease.2:49 A crane lifts the mast into position, where the crew secures the forestay and shrouds.4:33 Final tuning of the standing rigging remains to be completed after the initial installation.6:07

Assistir no YouTube

Mais de Sam Holmes Sailing

Sailing to Maratua, a rarely visited Indonesian island set. de 2026We hit a log sailing by strange Indonesian sea platformsago. de 2026Replacing a window while sailing through pirate waters and wildlife of Borneoago. de 2026Sandakan and Wildlife of Borneoago. de 2026

De Sam Holmes Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema