Sam Holmes Sailingvideo

Finishing the rigging and lifting the mast w/ Rolly Tasker rigging services in Phuket

30. november 2025 · 6 min · 32K visninger · Phuket

Hva denne videoen dekker

Sam Holmes replaces the forestay wire on his boat in Phuket, Thailand, utilizing professional rigging services from Rolly Tasker.Watch The process involves inspecting existing aluminum extrusions for the sail track and reassembling them onto the new wire using set screws and Loctite.0:25 The rigger installs a mechanical terminator on the forestay end by spacing the wire strands around a central wedge, applying anti-seize to prevent galling, and sealing the assembly with Sikaflex for water resistance.1:32 The Profurl furling drum is inspected and reattached to the base of the forestay.0:45 Before stepping the mast, the mast track is cleaned to ensure smooth slide movement, and the mast base ball is lubricated with PTFE grease.2:49 A crane lifts the mast into position, where the crew secures the forestay and shrouds.4:33 Final tuning of the standing rigging remains to be completed after the initial installation.6:07

Se på YouTube

Mer fra Sam Holmes Sailing

Sailing to Maratua, a rarely visited Indonesian island sep. 2026We hit a log sailing by strange Indonesian sea platformsaug. 2026Replacing a window while sailing through pirate waters and wildlife of Borneoaug. 2026Sandakan and Wildlife of Borneoaug. 2026

Fra Sam Holmes Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem