Sam Holmes Sailingvideo
Finishing the rigging and lifting the mast w/ Rolly Tasker rigging services in Phuket
30. november 2025 · 6 min · 32K visninger · Phuket
Hva denne videoen dekker
Sam Holmes replaces the forestay wire on his boat in Phuket, Thailand, utilizing professional rigging services from Rolly Tasker.Watch The process involves inspecting existing aluminum extrusions for the sail track and reassembling them onto the new wire using set screws and Loctite.0:25 The rigger installs a mechanical terminator on the forestay end by spacing the wire strands around a central wedge, applying anti-seize to prevent galling, and sealing the assembly with Sikaflex for water resistance.1:32 The Profurl furling drum is inspected and reattached to the base of the forestay.0:45 Before stepping the mast, the mast track is cleaned to ensure smooth slide movement, and the mast base ball is lubricated with PTFE grease.2:49 A crane lifts the mast into position, where the crew secures the forestay and shrouds.4:33 Final tuning of the standing rigging remains to be completed after the initial installation.6:07
Mer fra Sam Holmes Sailing
Fra Sam Holmes Sailing – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



