Sam Holmes Sailingvideo

Finishing the rigging and lifting the mast w/ Rolly Tasker rigging services in Phuket

30 November 2025 · 6 min · 32K views · Phuket

What this video covers

Sam Holmes replaces the forestay wire on his boat in Phuket, Thailand, utilizing professional rigging services from Rolly Tasker.Watch The process involves inspecting existing aluminum extrusions for the sail track and reassembling them onto the new wire using set screws and Loctite.0:25 The rigger installs a mechanical terminator on the forestay end by spacing the wire strands around a central wedge, applying anti-seize to prevent galling, and sealing the assembly with Sikaflex for water resistance.1:32 The Profurl furling drum is inspected and reattached to the base of the forestay.0:45 Before stepping the mast, the mast track is cleaned to ensure smooth slide movement, and the mast base ball is lubricated with PTFE grease.2:49 A crane lifts the mast into position, where the crew secures the forestay and shrouds.4:33 Final tuning of the standing rigging remains to be completed after the initial installation.6:07

Watch on YouTube

More from Sam Holmes Sailing

We hit a log sailing by strange Indonesian sea platformsAug 2026Replacing a window while sailing through pirate waters and wildlife of BorneoAug 2026Sandakan and Wildlife of BorneoAug 2026Kota Kinabalu Bound: Sailing, Survivor Island, Squalls, and Bugs, 3d printingJul 2026

From Sam Holmes Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue