Sailing Yabáβίντεο
Countdown to Christmas: 17 Days of Boat Jobs — Sailing Yabá 248
17 Δεκεμβρίου 2024 · 12 λεπτά · 40K προβολές
Τι καλύπτει αυτό το βίντεο
Ben and MP continue a series of refit projects on Yabá while docked at a marina.0:24 The crew installs new grids above the seating area to improve storage space and mounts a frame around the 24-volt electrical panel.10:57 To mitigate rust caused by saltwater deck washdowns and wave spray, they install six meters of PVC piping and elbow joints to redirect water drainage directly into the bilge.8:42 The crew also prepares for a major davit system installation, coordinating with local welders who arrived to take final measurements for the fabrication.11:08 Additionally, the arrival of specific stone materials allows for the completion of interior finish work in the head and living areas before the holidays.4:11 The crew plans to use the new davit system to hoist the dinghy once the welding work concludes.11:13
Περισσότερα από το Sailing Yabá
Από Sailing Yabá — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



