Sailing Yabávideo
Countdown to Christmas: 17 Days of Boat Jobs — Sailing Yabá 248
17 de diciembre de 2024 · 12 min · 40K vistas
¿Qué cubre este video?
Ben and MP continue a series of refit projects on Yabá while docked at a marina.0:24 The crew installs new grids above the seating area to improve storage space and mounts a frame around the 24-volt electrical panel.10:57 To mitigate rust caused by saltwater deck washdowns and wave spray, they install six meters of PVC piping and elbow joints to redirect water drainage directly into the bilge.8:42 The crew also prepares for a major davit system installation, coordinating with local welders who arrived to take final measurements for the fabrication.11:08 Additionally, the arrival of specific stone materials allows for the completion of interior finish work in the head and living areas before the holidays.4:11 The crew plans to use the new davit system to hoist the dinghy once the welding work concludes.11:13
Más de Sailing Yabá
De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



